Customization: | Available |
---|---|
Type: | Half Hot Air Roaster |
Voltage: | 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
DONGYI as a professional coffee roaster manufacturer in China, we are able to provide OEM&ODM services.
DY CLASSICS COFFEE ROASTERS
1. 1 year sold 2000+ to the world
2.Germany technology made
3.Electronic speed governor for HOT AIR [JMC TOP BRAND]
4.ADDK superior motor with OMRON VFD converter speed control [TOP BRAND]
5.310SUS double wall drum/cast iron drum option
6.Artisan roasting data logging [Bluetooth connect computer]
7.25ºC+ warm up temperature rate per minute
8. *Cast Iron gas burner [1-300kg gas roaster]
9.*carbon fiber heating tube [1-6kg electric roaster]
10. *CE\RoHS\ISO9001:2000
Quick Specifications DONGYI PRO commercial Roaster Machine | |
Roaster Model | DY-120KG |
Overview | - Includes stand-alone chaff collector * 2 - Automated charge and discharge via air assist - Dual water quench fire supression system in roaster & chaff collector - Requires power, gas,exhaust venting, and compressed air - PLC control system ( SIEMENS or OMRON 12" ) |
Capacity/Output | |
Drum Load Capacity | 120-130KG - green coffee beans |
Roasting Method | Half hot air blast & half direct fire |
Roasting Time | ≤20 minutes |
Output Capacity | 858 lb / hr, 6864 lb / day (390 kg/h, 3120 kg/day) |
PLC data Roasting | |
Connection | Integrated connection via PLC system |
Temperature Data | Bean temperature ( BT), environment temperature (ET) software data drum temperature(DT) incoming air pressure (IP) -- digital meters |
Roaster Data | Fan speed, drum speed, drum pressure, gas pressure |
Dimension & Clearances | |
Coffee Roaster | 173 in * 71 in * 145 in (440 cm * 180 cm * 370 cm) |
Chaff Cyclone Collector | 19.8 in * 19.8 in * 105 in (500 * 500 * 2600mm) |
Destoner machine for Option Match | 47 in * 28 in * 103 * in (1200 * 700 * 2600mm) |
Weight | N.W 3150KGS, G.W 4150KGS |
Roaster electrical & Gas Power | |
Service Required | Roaster: Three phase, 380/220V AC, 40A, 50-60HZ Loader: Three phase, 380/220V AC, 20A, 50-60HZ |
Gas Consumption | --5kg/hours (LPG gas), --6kg (city pipeline natural gas) |
Gas Burner Parameters | Inlet pipe 1/2", 1-10kpa range output 100kwt max gas pressure require: LPG gas ≥ 10kpa LNG ≥ 6kpa |
Compressed Air | |
Air Pressure | 1.60 cfm at 40 psi ( for air assist charge & discharge) |
Operator Assist | |
Feature | - Automated charge, discharge, cooling function - Automated machine shut down cooling cycle |
Workplace Safety | |
Details | - Cooling tray cover with automated stop - Manual drum crank in case of power outage - 100% food safe production path - Optional quick connect kits for easy vent cleaning |
Ocean Shipment Package Delivery | 16 M3 LCL or FUL 40 GP |